Byzantine Convergence in Robots Networks: The Price of Asynchrony

arXiv:0908.0390 First posted 2009-08-04 v1 Cited by 21
Cite this paper ×
BibTeX
@misc{lip2009byzantine,
  title = {Byzantine Convergence in Robots Networks: The Price of Asynchrony},
  author = {Zohir Bouzid (LIP6) and Maria Potop-Butucaru (LIP6 and INRIA Rocquencourt) and Sébastien Tixeuil (LIP6)},
  year = {2009},
  eprint = {0908.0390},
  archivePrefix = {arXiv},
  primaryClass = {cs.DC},
  url = {https://arxiv.org/abs/0908.0390}
}
APA
(LIP6), Z. B., (LIP6, M. P.-B., Rocquencourt), I., & (LIP6), S. T. (2009). Byzantine Convergence in Robots Networks: The Price of Asynchrony [Preprint]. arXiv. https://doi.org/10.48550/arXiv.0908.0390
GB/T 7714
(LIP6) ZB, (LIP6 MPB, ROCQUENCOURT) I, et al. Byzantine Convergence in Robots Networks: The Price of Asynchrony[EB/OL]. (2009-08-04)[2026-11-29]. https://arxiv.org/abs/0908.0390.

Abstract

We study the convergence problem in fully asynchronous, uni-dimensional robot networks that are prone to Byzantine (i.e. malicious) failures. In these settings, oblivious anonymous robots with arbitrary initial positions are required to eventually converge to an a apriori unknown position despite a subset of them exhibiting Byzantine behavior. Our contribution is twofold. We propose a deterministic algorithm that solves the problem in the most generic settings: fully asynchronous robots that operate in the non-atomic CORDA model. Our algorithm provides convergence in 5f+1-sized networks where f is the upper bound on the number of Byzantine robots. Additionally, we prove that 5f+1 is a lower bound whenever robot scheduling is fully asynchronous. This constrasts with previous results in partially synchronous robots networks, where 3f+1 robots are necessary and sufficient.

Post #1 · the paper

Discussion

No comments yet. Start the discussion!