The cost of continuity: performance of iterative solvers on isogeometric finite elements

arXiv:1206.2948 First posted 2012-06-13 v1 Cited by 99
Cite this paper ×
BibTeX
@misc{collier2012the,
  title = {The cost of continuity: performance of iterative solvers on isogeometric finite elements},
  author = {Nathan Collier and Lisandro Dalcin and David Pardo and V. M. Calo},
  year = {2012},
  eprint = {1206.2948},
  archivePrefix = {arXiv},
  primaryClass = {math.NA},
  url = {https://arxiv.org/abs/1206.2948}
}
APA
Collier, N., Dalcin, L., Pardo, D., & Calo, V. M. (2012). The cost of continuity: performance of iterative solvers on isogeometric finite elements [Preprint]. arXiv. https://doi.org/10.48550/arXiv.1206.2948
GB/T 7714
COLLIER N, DALCIN L, PARDO D, et al. The cost of continuity: performance of iterative solvers on isogeometric finite elements[EB/OL]. (2012-06-13)[2026-11-29]. https://arxiv.org/abs/1206.2948.

Abstract

In this paper we study how the use of a more continuous set of basis functions affects the cost of solving systems of linear equations resulting from a discretized Galerkin weak form. Specifically, we compare performance of linear solvers when discretizing using C^0 B-splines, which span traditional finite element spaces, and C^p-1 B-splines, which represent maximum continuity. We provide theoretical estimates for the increase in cost of the matrix-vector product as well as for the construction and application of black-box preconditioners. We accompany these estimates with numerical results and study their sensitivity to various grid parameters such as element size h and polynomial order of approximation p. Finally, we present timing results for a range of preconditioning options for the Laplace problem. We conclude that the matrix-vector product operation is at most slfrac33p^28 times more expensive for the more continuous space, although for moderately low p, this number is significantly reduced. Moreover, if static condensation is not employed, this number further reduces to at most a value of 8, even for high p. Preconditioning options can be up to p^3 times more expensive to setup, although this difference significantly decreases for some popular preconditioners such as Incomplete LU factorization.

Post #1 · the paper

Discussion

No comments yet. Start the discussion!