몬테 카를로 불확실성 분석과 베이지안 추론을 통한 PWR 핵심 시뮬레이션 개선
Improving PWR core simulations by Monte Carlo uncertainty analysis and Bayesian inference
Improving PWR core simulations by Monte Carlo uncertainty analysis and Bayesian inference
@misc{castro2016improving,
title = {Improving PWR core simulations by Monte Carlo uncertainty analysis and Bayesian inference},
author = {Emilio Castro and Carolina Ahnert and Oliver Buss and Nuria Garcia-Herranz and Axel Hoefer and Dieter Porsch},
year = {2016},
eprint = {1601.08036},
archivePrefix = {arXiv},
primaryClass = {nucl-th},
url = {https://arxiv.org/abs/1601.08036}
}
Castro, E., Ahnert, C., Buss, O., Garcia-Herranz, N., Hoefer, A., & Porsch, D. (2016). Improving PWR core simulations by Monte Carlo uncertainty analysis and Bayesian inference [Preprint]. arXiv. https://doi.org/10.48550/arXiv.1601.08036
CASTRO E, AHNERT C, BUSS O, et al. Improving PWR core simulations by Monte Carlo uncertainty analysis and Bayesian inference[EB/OL]. (2016-01-29)[2026-11-29]. https://arxiv.org/abs/1601.08036.
초록
PWR 원자력 발전소의 운전 파라미터 예측에 몬테 카를로 기반의 베이지안 추론 모델이 적용된다. 이 비섭동적 프레임워크에서는 미시적 핵 데이터의 불확실성을 기술하는 고차원 공분산 정보와 측정된 발전소 운전 데이터를 결합하여 붕소 환류 곡선과 연소도 의존적 발전소 전력 분포와 같은 적분 파라미터에 대해 통계적으로 타당하고 근거가 확실한 불확실성 추정을 제공한다. 본 방법론의 성능은 주어진 발전소 주기의 측정치를 사용하여 다음 주기의 예측을 개선하는 맹검 테스트 접근법으로 평가되었다. 결과적으로 예측 품질의 개선은 놀라운 수준이다. 특히, 발전소 주기 길이 계획에 있어 가장 중요한 붕소 환류 곡선의 예측 불확실성은 이전 주기의 붕소 농도 측정 정보를 분석에 포함함으로써 10 배 감소시킬 수 있다. 또한, 비섭동적 핵 데이터 업데이트의 초기 결과를 제시하며, 업데이트된 라이브러리로 얻은 예측은 적분 관측량에 직접 적용된 베이지안 추론으로 유도된 예측과 일관성을 가진다는 것을 보여준다.
A Monte Carlo-based Bayesian inference model is applied to the prediction of reactor operation parameters of a PWR nuclear power plant. In this non-perturbative framework, high-dimensional covariance information describing the uncertainty of microscopic nuclear data is combined with measured reactor operation data in order to provide statistically sound, well founded uncertainty estimates of integral parameters, such as the boron letdown curve and the burnup-dependent reactor power distribution. The performance of this methodology is assessed in a blind test approach, where we use measurements of a given reactor cycle to improve the prediction of the subsequent cycle. As it turns out, the resulting improvement of the prediction quality is impressive. In particular, the prediction uncertainty of the boron letdown curve, which is of utmost importance for the planning of the reactor cycle length, can be reduced by one order of magnitude by including the boron concentration measurement information of the previous cycle in the analysis. Additionally, we present first results of non-perturbative nuclear-data updating and show that predictions obtained with the updated libraries are consistent with those induced by Bayesian inference applied directly to the integral observables.