상수전력 부하를 갖는 DC 전력망 - 제 2 부: 음수 전력 수요, 실현 가능성 조건, 및 고전압 솔루션

DC power grids with constant-power loads - Part II: nonnegative power demands, conditions for feasibility, and high-voltage solutions

DC power grids with constant-power loads - Part II: nonnegative power demands, conditions for feasibility, and high-voltage solutions

arXiv:2011.09333 최초 게시 2020-11-18 v1 피인용 13 Submitted to IEEE Transactions on Automatic Control
이 논문 인용 ×
BibTeX
@misc{jeeninga2020dc,
  title = {DC power grids with constant-power loads - Part II: nonnegative power demands, conditions for feasibility, and high-voltage solutions},
  author = {Mark Jeeninga and Claudio De Persis and Arjan van der Schaft},
  year = {2020},
  eprint = {2011.09333},
  archivePrefix = {arXiv},
  primaryClass = {math.OC},
  url = {https://arxiv.org/abs/2011.09333}
}
APA
Jeeninga, M., Persis, C. D., & Schaft, A. V. D. (2020). DC power grids with constant-power loads - Part II: nonnegative power demands, conditions for feasibility, and high-voltage solutions [Preprint]. arXiv. https://doi.org/10.48550/arXiv.2011.09333
GB/T 7714
JEENINGA M, PERSIS CD, SCHAFT AVD. DC power grids with constant-power loads - Part II: nonnegative power demands, conditions for feasibility, and high-voltage solutions[EB/OL]. (2020-11-18)[2026-11-29]. https://arxiv.org/abs/2011.09333.

초록

번역 수정

이 두 부분으로 구성된 논문에서는 상수 부하를 가진 DC 전력망의 전력 흐름 방정식 실행 가능성 분석을 위한 통합 프레임워크를 개발합니다. 본 논문의 제 2 부분은 제 1 부분의 결과를 바탕으로 추가적인 함의를 탐구합니다. 특히, 제 1 부분의 몇 가지 결과를 정교화하여 음의 전력 수요가 아닌 비음수 전력 수요의 실행 필요충분조건을 도출합니다. 이는 제 1 부분의 실행 필요충분 LMI 조건보다 계산 비용이 낮습니다. 또한, 문헌에 존재하는 전력 흐름 실행 가능성에 대한 알려진 충분조건을 일반화하는 두 가지 새로운 충분조건을 증명합니다. 더 나아가, 실행 가능한 전력 수요 벡터와 관련된 유일한 장기 전압 반안정 작동점이 엄격한 고전압 해임을 증명합니다. 또한, 제 1 부분의 파라미터화와 쌍대인 관계에 있는 이러한 작동점들의 파라미터화, 그리고 실행 가능한 전력 수요 집합의 경계 파라미터화도 도출합니다.

#1 · 논문

토론

아직 댓글이 없습니다. 첫 댓글을 남겨 보세요.